The Creative

How long does it take, start to finish?

About 12–14 weeks. AdSpark — creative development and the media plan, built side by side — takes six; by the end your scripts are locked and your lookbook approved. Then roughly four weeks of pre-production, the shoot, and three to four of post. The biggest lever on speed is your side of the table: how fast feedback comes back.

Talk to a human

← Back to all questions